The project

So…we’ve bought a house! And its a do-er up-per! In fact its a bit of a mess. The kind of house your parents see and have huge question marks appear over their heads as their faces look on blankly! Yep, that’s the kind of house we’ve bought… and its lush!IMAG3381

The house isnt connected to mains elecricity and neither does it have any sewerage so that’s high up on our list of priorities. It does however have a delightful ‘black hole’ toilet outside which I have nightmares about just lifting the lid let alone sitting on. So a flushable toilet is a need of mine. We had many a discussion over whether we should have a humanure toilet or not, but I have managed to convince Matt that if we recycle our grey water a flushable toilet is definitely my preferred option. He agrees, as long as we can have a compost humanure toilet in the garden…deal!
We are opting for an uber solar system. It’s going to be a fairly large financial outlay initially but will mean no bills, which is definitely the way to go for us. We will have a battery storage system and it will run our lights, fridge, computer and washing machine! This, I am excited about. We visited the guys that will be building our solar panels and they run their warehouse completely off grid, build the panels themselves and its generally an awesome set up they have there! They are confident that they can build us an expandable system that will eventually be able to run the electricity in the ruins too (we are planning to renovate the adjoining ruins into holiday accommodation for children with Autism, but more of that another time).

We have opted for a septic tank to dispose of our waste. Again, we also discussed a reed bed to filter our waste water but logistics and the way the land is set out means this isnt really possible. We do want to minimise how often the tank needs emptying by not flushing toilet paper, and there is also some kind of eco-ball (I havent done very much research on this) that you put in every month or so to help break down the solid waste.

12200852_10156312855120089_1300244934_n
Inside

The house at the moment is split into two flats, with no connecting stairway. The flat upstairs (where the fire was) needs to be completely ripped out; including the render on the walls and walls being knocked down. We need to cut a pretty big hole in the ceiling to accommodate the stairs, rip up the floor downstairs and level it.

Upstairs before the fire
Upstairs before the fire

Downstairs also needs the stairs to be built, and plumbing for the kitchen and bathroom. The whole place needs new windows and doors too. This is the work the builders will be doing for us and we will be finishing the rest; building a kitchen, putting in a bathroom, tiling, crafting internal doors, painting and finsihing off.
*As a side note. Anyone got any cost effective alternatives for levelling a floor apart from using concrete? Suggestions will be muchly appreciated (virtual hugs will be given!)

Once finshined, the house will have two bedrooms upstairs with a toilet, and downstairs will have one big room to include the kitchen and living areas and a seperate bathroom and storage area.

But these are all theoretical plans at the moment. I can see us turning up after the builders have left to sit in our empty shell in Spain and laugh…or cry and think ‘what have we got ourselves in to?’ but im also sure we will soon get over that and get stuck in to our dream project. Fingers crossed.

I’ll be updating this section as and when we do different projects on the house. Can’t bloody wait!

One thought on “The project

Leave a Comment